Akobo Minerals started up operation of ultra-small plant to process first gold

Akobo Minerals AB, Scandinavian-based Ethiopian gold exploration and boutique mining company, announced in spring that it has reached a true milestone with the start of operations of its ultra-small plant and, with it, production of the company’s first gold. 

Left: Ultra small plant in action. Right: Akobo gold
© Akobo

Left: Ultra small plant in action. Right: Akobo gold
© Akobo
Jørgen Evjen, CEO of Akobo Minerals, said: “However you look at it, production of our first gold is an important landmark for the company and is a real boost for the employees following the incredible work they have already undertaken on our road to full production. We had hoped for production by now from the main processing plant, but this stop-gap measure of using a two tons/hour ultra-small plant will allow us to use this proof-of-concept to iron out any issues now, whilst also securing some early gold production.”

He added: “The final parts of the main plant are arriving in camp from Addis Ababa shortly, so first production is expected during the second quarter of 2023. In the meantime, we are using the time to complete all necessary building and operational elements of the plant and we will be well-placed for the main plant’s successful integration once on-site.”

The ultra-small plant began operation last week with already washed-out tailings from previous artisanal mining – and, surprisingly, actually extracted some gold. The next stage is to feed the plant with crushed and milled material from the locally sourced crushing machine which is also in operation. From this point, there will be a step change in the volume of recovered gold, even before the main processing plant is in situ.

The decision was taken to have an ultra-small plant delivered from Solo Resources as a stop-gap measure while the main plant was en route from South Africa, following delays primarily due to electricity shortages in the country and cement shortages in Ethiopia. With a desire to ensure its first gold production target was met on-time, the small plant acquisition demonstrates how creative and nimble Akobo Minerals can be as it meets the challenge of operating in a developing nation.

In recent weeks, significant levels of operational activity have been ramping up on-site – from foundation work and construction to commissioning – to meet the demands of a company that is building towards full gold production shortly.

www.akobominerals.com

Related articles:

Akobo Minerals hits gold in first drill hole at new mineralisation

Akobo Minerals, the Scandinavian-based Ethiopian gold exploration and boutique mining company, announced that it has hit visible gold in its first drill hole at the third mineralisation style 140 m...

more

Akobo Minerals wins prestigious ESG Nature award at Mining Indaba

Akobo Minerals, the Scandinavian-based Ethiopian gold exploration and boutique mining company, has won the prestigious 2023 ESG Nature award at Mining Indaba, Cape Town. Mining Indaba is Africa's...

more

Akobo Minerals continues rapid development of the Segele Mine

Akobo Minerals, the Scandinavian-based Ethiopian gold exploration and boutique mining company, provided an update on its activities to develop the Segele Gold Mine. Following the recent announcement...

more

Akobo Minerals gears up for gold production start-up with opening of rural Ethiopian airstrip

Akobo Minerals, the Scandinavian-based Ethiopian gold exploration and mining company, has announced details of the first ever flight to land at a new airstrip which it has funded and built in Dima....

more

Akobo Minerals intersects visible gold at 205 m depth

Akobo Minerals (Euronext Oslo – “AKOBO”) announced that it has intersected visible gold at 205 m hole depth as part of its extension drilling program at Segele. In addition to the visible gold...

more