Highlights at HILLHEAD 2024

Issue 07-08/2023 The Wirtgen Group at NordBau 2023

Production Systems – from individual products to entire process chains

From 6 to 10 September 2023, the Wirtgen Group product brands will be presenting a cross-section of their groundbreaking solutions for road construction and the processing of primary resources and...

more
Issue 11/2015

Productivity increase at LKAB’s ­Malmberget mine

ABB has won an order to supply a dual pinion high-speed ring-geared mill drive (RMD) system for LKAB’s latest grinding circuit expansion at the Malmberget iron ore mine in Swedish Lappland. The RMD...

more
Issue 04/2011

Productivity increase in the Aitik copper mine

High efficiency is a matter of survival for the Aitik copper mine in northern Sweden. The proportion of metal in the earth’s surface here is so low – less than 0.3 %, that it can only be extracted...

more
Issue 11/2015

Productivity increase with high-tech screening technology

Bogaevsky Karyer is a relatively new aggregates production and quarrying company with operations located not far from Oreshki village in the Ruzsky District of Moscow Province. Centered on the...

more
Issue 04 /2017

Prognostics tool for maintenance employed in copper mine

For the extraction of natural resources all over the world, Eurasian Natural Resources Corporation (ENRC) operates different types of equipment. For management of the equipment at a copper mine in...

more
Issue 07-08/2010

Program-Controlled Grinding and Screening Plant

A common problem in processing high-value bulk materials is that both a large size reduction ratio and a de-fined final grain size distribution within narrow grain size limits are often required. Dust...

more
Issue 01-02/2011

Progress

Improving the profitability of copper ore processing

1 Increasing grinding efficiency with the improved Vertimill Having acquired the licence in 1979, Metso (then Koppers) has exclusively supplied the Vertimill and steadily further developed it....

more
Issue 11/2012

Progress tracking from the engineering phase up to the construction site

From the engineering and manufacturing phase up to the final construction site, the entire machinery, e.g. roller mills for raw material or cement plants, passes through numerous stations. This is why...

more
Issue 07-08/2010

Promag 55S measures up to tough conditions

K+S KALI GmbH operates six mines, which produce the two raw materials, potash and magnesium. Since the raw salt obtained from the mine only contains 15 to 35 % of usable material, K+S uses a range of...

more

Promotion in RMI’s China office

High pressure reciprocating pump specialist RMI Pressure Systems has promoted Sabrina Zhang to the role of Director for Aftermarket Sales, Services and RMI Operations in China. Zhang has been with...

more