Metso to deliver all feeders to Koné Gold project in Côte d’Ivoire

Montage Gold has selected Metso to deliver all feeders for their Koné Gold project in Côte d’Ivoire. The order value has been booked in Minerals 2025 fourth-quarter order intake. The value is not disclosed.

“The delivery includes a complete range of feeders – apron, belt, and vibrating – designed to integrate seamlessly with Metso’s process equipment previously ordered for the project,” said Leif Berndt, Director, Feeding Solutions at Metso. “The feeders are a critical component of the dry comminution process, ensuring precise connectivity and protection across the circuit. Our large belt feeders feature the Metso Trellex® EP2500 Feeder Plus design, delivering superior strength and extended belt life compared to competing solutions.”

Metso apron feeder
© Metso

Metso apron feeder
© Metso

Dependable feeding solutions for any mining process and application

Feeders are used in mining operations to transfer materials from one process step to the next or to extract materials from storage stockpiles. Feeders ensure that bulky materials are correctly dozed, delivering a uniform flow of dry or moist fraction of rock or minerals.

Metso’s comprehensive range of feeders consists of apron feeders, belt feeders, grizzly feeders, pan feeders, and wobbler feeders that are available as standard or customized versions. They offer reliable performance even in the most challenging conditions. Designed for versatility and safety, they help increase production capacity and lower operating costs.

Discover more about Metso’s feeder offering for the mining industry here.

www.metso.com

Related articles:

Issue 07-08/2025

Metso to deliver process equipment to Twin Hills gold project

Osino Resources Corp. has awarded Metso with an order for the delivery of key process equipment for their Twin Hills gold project in central Namibia, approximately 150 km northwest of the capital city...

more
Issue 05-06/2025

Metso and G Mining Ventures sign agreement for gold project in Guyana

Metso and G Mining Ventures (GMIN) have signed an agreement on the delivery of key process equipment for the high-grade Oko West Gold Project in Co-operative Republic of Guyana in South America. The...

more